Corporate decarbonisation is becoming an increasingly important business priority. Regulators, investors, customers and supply-chain partners expect organisations to demonstrate how they are reducing emissions and progressing towards their sustainability commitments.
Singapore has committed to achieving net-zero emissions by 2050. Before then, the country aims to reduce emissions to around 60 million tonnes of carbon dioxide equivalent (MtCO₂e) by 2030 and between 45 and 50 MtCO₂e by 2035.
Renewable energy will play an important role in this transition. After reaching 2 gigawatt-peak (GWp) of solar capacity in 2025, five years ahead of schedule, Singapore raised its solar deployment target to 3 GWp by 2030. At the building level, BCA Green Mark 2021 also places greater emphasis on energy performance, carbon reduction and broader sustainability outcomes.
Every enterprise has a different emissions profile, electricity demand, facility arrangement and level of control over its property.
For businesses, this creates a need to understand the different decarbonisation solutions available. These may include reducing electricity demand, generating renewable electricity on-site and procuring renewable energy for the demand that remains.
In this blog, we explore the main decarbonisation solutions for businesses in Singapore and explain how they can be combined into a practical, phased corporate renewable energy strategy.
Start With Your Emissions and Energy Baseline
Before choosing a solar or renewable energy solution, a business needs to understand where its emissions come from and how energy is used across its operations.
Corporate emissions are generally divided into three categories:
- Scope 1 emissions: Direct emissions from sources owned or controlled by the organisation
- Scope 2 emissions: Indirect emissions associated with purchased electricity, steam, heating or cooling
- Scope 3 emissions: Other indirect emissions across the organisation’s value chain
For many commercial and industrial businesses, purchased electricity is a significant source of Scope 2 emissions. Therefore, understanding electricity consumption is a useful starting point for developing a decarbonisation plan.
Businesses should also review:
- Annual and monthly electricity consumption
- Daytime and night-time electricity demand
- Major energy-consuming equipment
- Building ownership and tenancy arrangements
- Available rooftop or land space
- Existing renewable energy contracts and Renewable Energy Certificates (RECs)
- Corporate emissions targets and reporting boundaries
This baseline helps the organisation identify where electricity use can be reduced and how much remaining demand could be addressed through renewable energy. It also prevents businesses from selecting a solution before understanding whether it fits their operations.
Singapore’s Scope 2 Emissions Reduction Playbook similarly highlights energy efficiency, renewable energy generation and green energy procurement as potential approaches to reducing electricity-related emissions.
Solution 1: Reduce Electricity Demand Through Energy Efficiency
Once the baseline is clear, the next step is to identify where avoidable electricity use can be reduced.
Energy-efficiency measures may include:
- Upgrading lighting and air-conditioning systems
- Improving building and equipment controls
- Introducing energy monitoring and sub-metering
- Using more efficient motors, refrigeration systems and industrial equipment
- Optimising operating schedules and equipment loads
- Carrying out preventive maintenance
These improvements can reduce both operating costs and Scope 2 emissions. They can also lower the amount of renewable electricity the organisation needs to generate or procure.
For example, improving cooling-system efficiency reduces electricity demand throughout the day. A solar system can then be designed around the facility’s updated consumption profile rather than an inefficient baseline.
Energy efficiency can also support broader building-performance objectives under BCA Green Mark 2021, which places strong emphasis on energy performance alongside maintainability, smart technologies, carbon reduction, resilience, health and wellbeing.
Solution 2: Install On-Site Solar Through an EPC Model
After reducing avoidable electricity demand, businesses can consider whether on-site solar is technically and commercially suitable.
One option is an Engineering, Procurement and Construction (EPC) model. Under this arrangement, a solar provider designs the system, procures the equipment and manages construction. Once completed, the enterprise funds and owns the solar asset.
Direct ownership may suit organisations that:
- Have capital available for the installation
- Own or control the property over a long period
- Want to retain ownership of the solar equipment
- Can manage operations and maintenance internally or appoint a separate contractor
The solar electricity generated can reduce the amount of grid electricity used during the day. At the same time, owning the system gives the business greater control over its design, operation and long-term asset management.
However, ownership also comes with additional responsibilities. The business must account for the upfront investment as well as monitoring, maintenance, repairs, insurance and equipment replacement over the system’s operating life.
Rooftop size is not the only consideration. Structural condition, roof layout, shading, electrical infrastructure and the facility’s electricity profile must also be assessed. EMA’s solar installation guidance recommends considering roof complexity, surrounding shade, waterproofing and electricity usage when evaluating a site.
Solution 3: Adopt On-Site Solar Through a Corporate PPA
For businesses that want on-site solar without purchasing the equipment, a Power Purchase Agreement (PPA) offers an alternative.
Under our zero-CAPEX PPA model, we fund, install, own, operate and maintain the solar energy system throughout the agreement, subject to the terms of the applicable PPA. The customer purchases the solar electricity generated at the agreed PPA rate.
Potential advantages may include:
- No upfront capital expenditure for the solar system, subject to the agreed commercial terms;
- On-site renewable electricity generation;
- Reduced operational and maintenance responsibilities for internal teams;
- Greater visibility over the price of the solar-generated electricity, subject to the applicable PPA pricing structure; and
- Ongoing system monitoring and performance management.
By removing the need to purchase the equipment, a PPA also allows the organisation to preserve capital for other business priorities.
However, suitability still depends on the facility. Rooftop condition, daytime electricity demand, tenancy arrangements and the organisation’s contract horizon all need to be considered. The building will also continue drawing electricity from the grid at night or whenever solar generation is insufficient.
A PPA is therefore not a complete replacement for grid electricity. Instead, it allows a suitable facility to meet part of its daytime demand through solar while reducing the technical and financial responsibilities associated with system ownership.
Solution 4: Use Roof Leasing Where Direct Consumption Is Less Practical
Not every commercial or industrial building is well suited to a solar PPA. For example, a building may have multiple tenants, separate meters, low daytime consumption or complex electricity arrangements. In these cases, linking the solar electricity directly to the property owner’s consumption may be difficult.
Under our roof leasing model, the property owner leases available rooftop space to us and receives an agreed rental income. We develop and operate the solar system without requiring the owner to purchase the electricity generated.
This allows building owners to create value from underutilised rooftop space while supporting Singapore’s renewable energy deployment.
However, roof leasing should not be confused with a PPA. Under a PPA, the customer purchases the solar electricity generated. Under roof leasing, the commercial arrangement centres on the use of the rooftop.
As a result, leasing out a roof may support renewable electricity generation without directly reducing the property owner’s purchased electricity or reported Scope 2 emissions. Businesses should therefore consider whether their priority is to reduce electricity-related emissions, generate rental income or support broader renewable energy deployment.
Solution 5: Address Remaining Demand With RECs and Renewable Procurement
Even after improving energy efficiency and installing viable on-site solar, an organisation may still have electricity demand that cannot be met at its facility.
Renewable Energy Certificates (REC) can support renewable energy procurement and related renewable energy claims for the remaining electricity demand. A REC generally represents the environmental attributes associated with one megawatt-hour (MWh) of electricity generated from a renewable energy source and delivered to the grid.
Purchasing and retiring a REC does not mean that electricity from a particular renewable energy project is physically delivered to the company’s building. Rather, subject to the applicable reporting framework and the relevant REC being validly transferred and retired, the organisation may use the associated renewable energy attributes in making renewable energy consumption or emissions-related claims.
Credible REC use depends on clear:
- Issuance
- Ownership transfer
- Tracking
- Retirement
- Renewable energy claims
Singapore Standard SS 673 provides guidance across the REC lifecycle, including production, verification, transfer, retirement and the claims made by end users.
Businesses may also consider green retail electricity contracts or virtual PPAs. These arrangements can support renewable energy procurement where on-site generation is limited by rooftop conditions, tenancy arrangements or electricity demand.
RECs and off-site procurement are therefore most useful when treated as complementary tools. Energy efficiency can reduce the organisation’s demand, on-site solar can address a viable portion of that demand, and credible renewable procurement can cover part of what remains.
How Renewable Energy Can Support a Green Mark Strategy
Renewable energy may also contribute to a wider building-performance strategy under Green Mark 2021.
Green Mark applies to new and existing buildings, including commercial and industrial properties. However, it is a comprehensive building certification framework rather than a solar certification.
Installing solar panels alone does not guarantee a particular Green Mark rating. The assessment also considers areas such as:
- Overall energy performance
- Maintainability
- Smart technologies and performance monitoring
- Embodied and operational carbon
- Climate resilience
- Health and wellbeing
Therefore, businesses pursuing certification should consider solar as one part of a broader building strategy. For example, renewable electricity generation may support energy and carbon objectives, while building controls, efficient equipment and performance monitoring contribute to other assessment areas.
The applicable criteria will depend on the building type, project category and desired rating. Where Green Mark certification is a formal objective, businesses should involve qualified Green Mark professionals early in the planning process.
Building a Phased Corporate Decarbonisation Roadmap
Rather than selecting disconnected sustainability initiatives, businesses can organise their decarbonisation solutions around a common emissions baseline.
A practical roadmap may follow six phases:
- Establish the baseline
a. Measure electricity consumption, identify major emissions sources and define the organisation’s reporting boundaries.
- Identify energy-efficiency opportunities
a. Reduce avoidable electricity use through equipment upgrades, improved controls, operational changes and preventive maintenance.
- Assess on-site solar potential
a. Review rooftop conditions, electricity demand, electrical infrastructure, property arrangements and technical feasibility.
- Compare the available solar models
a. Determine whether direct ownership through an EPC arrangement, a zero-CAPEX PPA or roof leasing best fits the facility and the organisation’s priorities.
- Address remaining electricity demand
a. Evaluate RECs, green retail contracts or virtual PPAs after viable energy-efficiency and on-site generation opportunities have been considered.
- Monitor and review progress
a. Track electricity use, renewable generation and emissions outcomes against corporate targets, reporting requirements and building-performance goals.
Importantly, the roadmap should distinguish between three different outcomes: reducing energy consumption, generating renewable electricity on-site and making market-based renewable energy claims.
All three may support a corporate decarbonisation strategy, but they do not represent the same action or produce the same operational result.
Choosing a Renewable Energy Solutions Provider in Singapore
Because every facility is different, a provider should assess technical feasibility and commercial fit before recommending a model.
When evaluating a renewable energy solutions provider in Singapore, businesses should consider:
- Experience with commercial and industrial facilities
- Technical design and engineering capabilities
- Understanding of local grid and regulatory requirements
- Access to appropriate project-financing structures
- Operations, maintenance and monitoring capabilities
- Clear reporting and performance-management processes
- Ability to work with different rooftop, consumption and tenancy arrangements
- Transparent explanations of REC ownership and environmental claims
- Long-term operational and financial capability
Businesses should also clarify which party owns the solar system, electricity, RECs, performance data and environmental attributes under the proposed arrangement. These details affect not only the commercial model but also how renewable energy outcomes may be reported.
Our approach is to assess each facility’s rooftop, electricity demand, tenancy structure and business priorities before recommending a solution. Through our PPA and roof leasing models, we help commercial and industrial property owners identify an approach suited to how their facilities operate.
Build Your Decarbonisation Strategy Around Your Facility
Effective corporate decarbonisation rarely depends on one solution alone. It usually requires a combination of lower electricity demand, suitable on-site renewable generation and credible procurement for the consumption that remains.
EPC ownership, solar PPAs, roof leasing and RECs each serve a different purpose. The right approach depends on the organisation’s capital priorities, facility conditions, electricity profile, property arrangements and emissions objectives.
Renewable energy can also support a wider Green Mark or net-zero strategy, but its value depends on how well it is integrated with the organisation’s overall energy and building-performance plan.
That is why the starting point should be an energy and site assessment rather than a preferred commercial model. Once the facility’s needs and constraints are clear, the organisation can build a more practical roadmap around the solutions that fit.